We are in SRM 6.0 with ECC 6.0 as the backend. We are having the following issue with plan-driven (using ECS):
There are 2 purchasing groups in the org model which refer to the backend - Y04 and Y05. All the requirements are sent into SRM assigned to Y04, even though there are pur reqs in the backend which have Y05 as the pur grp.
Anybody have a clue ?
Thanks
-Bakulesh