Loading point determination

Dear Sap Gurus,

In shipping point, to determine load time, there are four criteria in detrmining load time.

in that what is route dependent loading time, and route independent loading time.

divya

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Best Answer
    avatar image
    Former Member
    Jul 21, 2008 at 05:56 AM

    Hi,

    In shipment scheduling, the route-related scheduling of the shipping points is used to determine the loading time and the pick/pack time.This is called route dependent loadtime.Route independent loadtime will not participate in Shipment scheduling..

    Also go through Note 753563..

    Regards..

    Yogi..