on 07-21-2008 6:17 AM
Dear Sap Gurus,
In shipping point, to determine load time, there are four criteria in detrmining load time.
in that what is route dependent loading time, and route independent loading time.
divya
Hi,
In shipment scheduling, the route-related scheduling of the shipping points is used to determine the loading time and the pick/pack time.This is called route dependent loadtime.Route independent loadtime will not participate in Shipment scheduling..
Also go through Note 753563..
Regards..
Yogi..
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.