cancel
Showing results for 
Search instead for 
Did you mean: 

Loading point determination

Former Member
0 Kudos

Dear Sap Gurus,

In shipping point, to determine load time, there are four criteria in detrmining load time.

in that what is route dependent loading time, and route independent loading time.

divya

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

In shipment scheduling, the route-related scheduling of the shipping points is used to determine the loading time and the pick/pack time.This is called route dependent loadtime.Route independent loadtime will not participate in Shipment scheduling..

Also go through Note 753563..

Regards..

Yogi..

Answers (0)