Hi Gurus,
I am maintaining source list for a material, putting up 2 vendors for the same material , and then doing quota arrangement of 40% and 60% between two vendors. But when i made the PO, I am able to save the PO with one vendor supplying 100% of the material. Is there anything to fix up the quota arrangement?
Thanks.
Kumar