Skip to Content
0
Jul 20, 2008 at 03:30 PM

Quota arrangement

19 Views

Hi Gurus,

I am maintaining source list for a material, putting up 2 vendors for the same material , and then doing quota arrangement of 40% and 60% between two vendors. But when i made the PO, I am able to save the PO with one vendor supplying 100% of the material. Is there anything to fix up the quota arrangement?

Thanks.

Kumar