Dear All,
i facing this error while i am executing the KKF6N transaction.
i have assigned the cost element ( internal activity allocation) in the source atructure...
but even though i getting the error....can any one put some light on this and help me out with an explaination wher i am going wrong or something is missed by me....
No source assignment found for cost element 701000
Message no. KD560
Diagnosis
The sender bears the A1 source structure and was debited with costs from the 701000 cost element. This cost element is not assigned to any source assignment in the 0100 controlling area of the 0100 source source structure.
Procedure
Maintain the A1 source structure.
and while executing the MFBF transaction i am getting the following error...
Error determining the cost estimate
Message no. RM078
Diagnosis
The system cannot determine a cost estimate which the system uses to proposes the backflushed activity quantities.
There are several causes for this problem.
You define the cost estimate the system is to use to propose the activity quantities in repetitive manufacturing, in the control parameters of the repetitive manufacturing profile.
Backflush on the basis of the preliminary costing - product cost collector
If you have defined, for example, that the backflush is to be carried out on the basis of a preliminmary costing for a product cost collector, you must also have created a preliminary costing for the cost collector.
Note that you cannot create a preliminary costing for a product cost collector with the controlling level "product cost plant/planning plant".
Backflush on the basis of the standard cost estimate - material
You must have created a standard cost estimate for the material.
It must be a cost estimate with quantity structure. This standard cost estimate must be flagged and released.
If a material is to be produced in repetitive manufacturing, you must set the indicator Repetitive mfg in the MRP view of the material master record before you create the standard cost estimate for the material. The system only updates the costs per operation in repetitive manufacturing if you have set this indicator.
Procedure
In the repetitive manufacturing profile, check what option the system is to use to propose the activity quantities. It may make sense to change the existing setting if, for example, you have defined that the backflush is to be carried out on the basis of the standard cost estimate but you actually work with a generic cost collector.
Check whether a preliminary costing for the cost collector or a flagged and released standard cost estimate for the material exists. To do this, branch to the information system of Product Cost Controlling.
Set the indicator repetitive mfg in the material master record.
If necessary, create the missing cost estimate.
To create a standard cost estimate for the material, branch to the menu of Product Cost Planning.
To create a preliminary costing for the cost collector, branch to the menu for Periodic Product Controlling.
we are in 6.0 with repetative manufacturing.....
regards
Praveen