Hi Expert,
In ECC 6.0 there is option to create tolerance key in purchase requision configuration. If this tolerance key is assigned to the PR document type,while creating the PO, system issues a warning message if the PO net price is above the tolerance limit.
But in configuration there is no option to assign the tolerance key to the document type