i am creating a process order for material fert material A having 2 operation in the recipe i want to carry out consumption of roh material b1,b2,b3 (261 mvmt) when i confirm order & i also need halb product generation C (101 MVMT) when i create GR.that is mb31. for first operation.the second operation has to consume material C.(which is produced from operation one) & consume d1,d2,d3 roh material & mb31 should generate halb material E & order header material A.
HOW CAN U DO THIS?
when i confirm first operation i can consume b1,b2,b3 & when i do mb31 for gr gainst then system generates both material, A & C & further possibility is not possible?
can any one help me in this?
pl. help asap
thanks
kareena