Hi ,
We are facing a problem with Product Allocation.We want to do Production Allocation check also with ATP check.Presently we are calling the standard FM COM_PCAT_ATP_CHECK from CRM for doing the ATP check. The FM makes a RFC call CRM_CALL_ATP_BAPI in R/3 for the ATP check.This BAPI uses the FM BAPI_MATERIAL_AVAILABILITY.Is there any way to do the Product Allocation check with this FM call?It only does an ATP check?Is there any FM which can be used to do the Production Allocation check.Any input is greatly appreciated.
Thanks,
Prashant