Former Member
Jul 18, 2008 at 03:31 PM

Kanban- issue

803 Views

Hi All,

Actually My scenario is

I configured a setting for some bulk material as kanban material and created a replenishment strategy with control type Direct transfer and issue the cost to the cost center with 201 movement type.

I am moving the parts from storage location 1000 [Finished Material] to 2000 [Shop Floor]

Here is I am facing a problem

When I am doing the Kanban Container FULL to EMPTY through [Transaction PKBC] Parts are moved from storage location 1000 and cost is issued to cost center but I am not seeing any change in Shop Floor storage location qty its still remains same even after making the container full..........

See example

Part Number: ABCD1

Part Number Storage Location qty

ABCD1 1000 100

ABCD1 2000 5

If I made the kanban container FULL to EMPTY, quantity is reduced as 99 from 100 for storage location 1000 and GI to cost center is happening but

the stock is not getting increased in storage location 2000 even after make the container full.

Kindly could any can help me to solve this will be thankful.

Thanks in Advance