Hi

We are migrating our PI systems to 75 SP08(from 74)

We would like to export all the ATP jobs from old system to new system.

Is there a way we can export import the jobs or is it manual?

We have 1000+ jobs in the system which will take lot of time if we do manual configuration and at the same time it is error prone.

Thanks,

Dhanish