Hi consultants,
In PPPI, I have a resource WC-1 that has a 5 hour schedule/capacity for this is a machine. What if there's a scheduled breakdown/downtime inside this 5 hour schedule? How can I set up the data in such a way, there's an availability of the work center.
Ex. during 3PM - 5PM the WC-1 is not available.
Thanks,
Kumar