Hi,
Please guide,i have a simple Bom of F1 having R1 and R2 as a raw in it,the base Quantity of F1,R1,R2 is one and to produce 1 F1,it consume 1 R1 and 1 R2.
In Production order of 10 F1,it consume 10 R1and 10 F2(which is found in component overview too),but while doing confirmation of order in co11n,with all 10 qty.it is throwing the message "__Goods reciept quantity does not match with consumption items quantity__.".
Where the things going wrong.
Thanks in Adv.
Rishi