on 07-16-2008 6:43 PM
Hello
Can any one guide me , how to do MRP settings for subcontract Proces.We want the system to generate MRP for the subcontract Process, We need B & C Material to Make A. A is a finished goods , B is going to Produce and ship to subcontract Vendor and C will be Procured and directly shipped to Subcontract Vendor . We are going to get back A as a finished Goods. Can any one please tell me what will be the MRP Settings required to create a Sub contract Purchase Requisition ?
Thanks
JJ
Hi,
You need to assign special procurement type in Material Master in MRP view. The detailed steps are available in the below link. Please go through it
http://help.sap.com/bp_bblibrary/500/Documentation/Q15_BB_ConfigGuide_EN_DE.doc
Thanks,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
in your case, A if FG
B & C in BOM,
B you are providing to the vendor by manufacturing that in inhouse and C directly from third vendor to subcontracot
setting.
in material A master, put procurment type F with special procurement key as 30, subcontacting. maintian the subcon inforecord (MM side)
in material B put the procurment type E
in material C put the procurment type F.
i think it should solve your issue.
since you want to provide the material from third vendor to the subconta....those things can be handled from MM side.
Regards,
Pravin Mukkawar
Thanks Guys , iT works
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
For material B, it is a inhouse production. Set E - inhouse production in MRP2 view.
For material C, it is a External procurement - F, assign in MRP2 view. For material C, maintain delivery place at Subcontract place in MIGO screen, so that material directly dispatch to subcontract place.
For material A, external procurement - F, maintain in MRP2 view. Maintain BOM for material A.
When BOM explodes, P.R will create for material A.
Send material B by ME2O 541 mvt.
And receive material A by MIGO 101 mvt.
Regards,
Dharma
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi JJ,
Please refer the link for Steps in subcontracting.
[Steps for Subcontracting |http://www.sap-img.com/production/steps-for-subcontracting.htm]
Regards,
R.Brahmankar
Edited by: R Brahmankar on Jul 17, 2008 9:18 AM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
For the finished good "A" maintain in the MRP2 view ,the procurement type as "F" and the special procurement key "30" i.e subcontracting and for your "B" maintain the procurement type as "X" and for "C" maintain procurement type as "F" and maintain the planned delivery time for externally procured ones and inhouse production time for internally produced ones.
reward if useful
regards
Kumar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
85 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.