In REM MTS scenario with strategy 40 I want to use one tool for perticuler product on production line. Whether i should create it as equipment PRT and assign it in routing to operation. Then question is if i assign to operation, how to get the information about PRT in planned order of that product.

If am making mistake, please guide me step by step for PRT assignment and to know the requirement of PRT for planned order.

thanks in advance,

Milind

Accepted Solutions (0)

Answers (3)

Answers (3)

rupesh_brahmankar3
Active Contributor
0 Kudos

Hi Milind,

You need to select all equipments (PRT) for a routing operation

Look at table CRVE_A "Assignment PRT data - equipment", it establishes a link CRID (OBJTY OBJID) -> EQUI (EQUNR)

EAPL "Allocation of task lists to pieces of equipment"

Regards

R.Brahmankar

Former Member
0 Kudos

thanks

regards,

Former Member
0 Kudos

Hi any body can help on this?

Thanks and regards,

milind

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello Milind,

Please go trough the link.

[Assigning PRTs to an Operation|http://help.sap.com/saphelp_46c/helpdata/en/5b/ae35634b8611d182ba0000e829fbfe/frameset.htm]

To know the availability of PRT then you need to mark in availability check including PRT.

Rewards If useful.

Regards,

R.Brahmankar

Edited by: R Brahmankar on Jul 17, 2008 10:14 AM

Former Member
0 Kudos

Hi,

But how the planner will know which PRT is being used for perticuler product?

thanks and regards,

milind

Former Member
0 Kudos

HI,

U Can see system status on IE03.

PRT Other T codes

CF10 PRT: Use of PRT master in prod.order

CF11 PRT: Use of material in prod. order

CF12 PRT: Use of document in prod. order

CF13 PRT: Use of equipment in prod. order

CF15 PRT: Use of PRT master in network

CF16 PRT: Use of material in network

CF17 PRT: Use of document in network

CF18 PRT: Use of piece of equip. in netw.

CF20 PRT: Use of PRT master in orders

CF21 PRT: Use of material in orders

CF22 PRT: Use of document in orders

CF23 PRT: Use of pc. of equip. in orders

CF25 PRT: PRT Master Usage in PM Order

CF26 PRT: Material Usage in PM Orders

CF27 PRT: Document Usage in PM Orders

CF28 PRT: Equipment Usage in PM Order