Skip to Content
author's profile photo Former Member
Former Member

PRT

Hi Experts,

In REM MTS scenario with strategy 40 I want to use one tool for perticuler product on production line. Whether i should create it as equipment PRT and assign it in routing to operation. Then question is if i assign to operation, how to get the information about PRT in planned order of that product.

If am making mistake, please guide me step by step for PRT assignment and to know the requirement of PRT for planned order.

thanks in advance,

Milind

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jul 16, 2008 at 02:38 PM

    Hi any body can help on this?

    Thanks and regards,

    milind

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      HI,

      U Can see system status on IE03.

      PRT Other T codes

      CF10 PRT: Use of PRT master in prod.order

      CF11 PRT: Use of material in prod. order

      CF12 PRT: Use of document in prod. order

      CF13 PRT: Use of equipment in prod. order

      CF15 PRT: Use of PRT master in network

      CF16 PRT: Use of material in network

      CF17 PRT: Use of document in network

      CF18 PRT: Use of piece of equip. in netw.

      CF20 PRT: Use of PRT master in orders

      CF21 PRT: Use of material in orders

      CF22 PRT: Use of document in orders

      CF23 PRT: Use of pc. of equip. in orders

      CF25 PRT: PRT Master Usage in PM Order

      CF26 PRT: Material Usage in PM Orders

      CF27 PRT: Document Usage in PM Orders

      CF28 PRT: Equipment Usage in PM Order

  • author's profile photo Former Member
    Former Member
    Posted on Jul 17, 2008 at 07:21 AM

    thanks

    regards,

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jul 26, 2008 at 10:19 AM

    Hi Milind,

    You need to select all equipments (PRT) for a routing operation

    Look at table CRVE_A "Assignment PRT data - equipment", it establishes a link CRID (OBJTY OBJID) -> EQUI (EQUNR)

    EAPL "Allocation of task lists to pieces of equipment"

    Regards

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.