can anybody tell me that can we add freight cost ( transpotation cost on material )
During transfer posting from one Storage location to other storage location
how can we do it what setting we need to do it ?
full poinst will be rewarded !!!
thanks in advance
Hi Sachin,
If both storage locations belong to one plant, it is not possible to add frieght costs to the material.
Regards,
Manik
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear,
I dont think is there any option to add frieght at time of tranfer posting..
You can adjust that in purchase order conditions..
The either option add the new line item in po or work order as frieght conditions and make payment..
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
we cannot add freight cost from storage location to storage location in one step and two step.
If u want to add freight you have to go for Strock transport order.
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.