Hi Gurus,
I have created a new shipment document and a new shipment cost document. I have created the news document with the settlement date to 30.06.2008. Then, I have transferred the shipment cost document.
The problem is the document date of the new account document that is 16.07.2008, while the posting date is 30.06.2008.
Is it possible to change or to assign the document date before to transfer the shipment cost document?
Thanks in advance.
XeviG.