Dear All

pl help to give guide lines for releasing the quotation what customising are to be done i m not able to rel the same in ME45 as info displays as No pur docum exists

sap11

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • Posted on Jul 16, 2008 at 08:24 AM

    Hi,

    Check the Characteristic values defined in the release stratergy. make use of these values and create a RFQ. it will surely work.

    Before trying stimulate the stratergies and see first if it is working fine.

    Thanks & regards,

    Kiran

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 16, 2008 at 08:27 AM

    Hi,

    Release is possible for RFQ and not for quotation.

    To configure the release for RFQ, follow the steps

    1.Create Characteristics and assign to class 032.T.Code CT04

    2.Assign Object to class in CL20n.

    In SPRO Configure for Release for RFQ

    MM>Purchasing>RFQ/Quotation-->Release procedure for RFQs

    Define release procedure for RFQ.

    Regards,

    Manik

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jul 16, 2008 at 08:29 AM

    Hi,

    First check in ME42, whether release strategy has been applied for RFQ or not?

    If not then check the config. and characteristics values whether criteria for RFQ meets as per the characteristics values then only RFQ will go under release.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 16, 2008 at 08:29 AM

    what r the characteristics u r using?pls check whether u r using the characteristic based on document type and in it u have assigned the document type code for RFQ i.e. AN.Also check whether all the characteristic u r using are confirming with the values u have entered in the RFQ.

    regards,

    indranil

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Kiran. V

      Dear Kiran ,

      i had made two char for RFQ , one for plant & second for Curr so in char for Curr i had given fields as GNETW , is this field is correct or i should have given as WAERS , which one is correct, pl guide , OR if i just want to create char for plant only but char for value is also important, so i need to clear that any how i hd to create two char for rel

      char for RFQ.

      sap11

  • author's profile photo Former Member
    Former Member
    Posted on Sep 23, 2008 at 11:21 AM

    thanx

    sap11

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.