Skip to Content
0
Former Member
Jul 16, 2008 at 06:52 AM

Inspection Plan assignment not Possible

71 Views

Hi,

I am facing the problem in Inspection Lot Status.:

The material is maintained with the Revesion level.

When the Inspection lotis created against GR processing , the inspection plan is not assigned to the inspection lot automatically,though their exist only one plan for the material.

The status of Inspection Lot is always CRTD and not in REL

The plan can be assigned through QA02 only.

The Inspection Plan is created well before the creation of Inspection Lot ( GR process).

My question is Why the Inspection Lot is always in *CRTD status & Is the Material Revesion level has an impact on the Inspection Lot Status?

Please let me know what should be done so that the plans get assigned to the lots automatically.

Thanks in advance

Edited by: chetan chaskar on Jul 16, 2008 8:54 AM