Skip to Content
0

KPI Modeler with ABAP based CDS views -BW on HANA

Feb 26 at 10:50 AM

5

avatar image

hi All,

Our customer installed Suite on HANA with BW , we have to develop the KPI drill downs and KPI Tiles . In S/4 Hana, KPI design is available to create the KPI tiles, Evaluations, Drill downs using CDS views . I need the similar capabilities on BW on HANA.

As per my understanding we can still create the KPI Drill downs using calculation views in HANA. But I would like to use some thing similar to S/4 HANA capabilities in SOH.

Please advise on required components Roles .

Thanks,
Dayakar.

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

0 Answers