MRP tabs setup (material Master)

420 Views

Hi PP Masters,

How do i setup the material master for the Finished Good so that it will behave in such a way that after MRP run, the system doesn't create a Planned Order until the total material requirement is equal to the fixed lot size set in the material master.

for example

1.) fixed lot size = 10

the shortage = 4

no of planned order = 0

2.) fixed lot size = 10

shortage = 10

no of planned order = 1

3.) fixed lot size = 10

shortage = 11

no of planned order = 1

Thank you,

Heinrick Palad