Hi PP Masters,
How do i setup the material master for the Finished Good so that it will behave in such a way that after MRP run, the system doesn't create a Planned Order until the total material requirement is equal to the fixed lot size set in the material master.
for example
1.) fixed lot size = 10
the shortage = 4
no of planned order = 0
2.) fixed lot size = 10
shortage = 10
no of planned order = 1
3.) fixed lot size = 10
shortage = 11
no of planned order = 1
Thank you,
Heinrick Palad