cancel
Showing results for 
Search instead for 
Did you mean: 

Dynamic Modification criteria

former_member206980
Active Participant
0 Kudos

Hi,

We have a scenario that a material has assigned inspection type 01, material comes in a truck. G R is done also Truck wise, Sysmatically we get inspection lot truck wise.

Now. user want to inspect only single lot for a Vendor even though we get 10 to 15 Lot against that Vendor in the same day.

Can we apply here dynamic modification rule or pl suggest any other way to simplify this procedure.

Regards,

SADAN

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member42744
Active Contributor
0 Kudos

Yes.. create DMR with one inspection and then a skip stage of 999 lots. Set a maximum skip duration of 1 day. You should then get one lot each day. Plan should be assigned to the material/vendor combination.

Craig