Skip to Content
avatar image
Former Member

Assembly Scrap for Costing BOM/Routing

Our client has separate BOMs and Routings for costing purpose and costing variant is configured in such a way that it picks up the costing BOM and routing.

Material master assembly scrap is updated by running CA97N using production BOM/Routing, production operation scrap %.

However we have a scenario where costing routing operation scrap can also differ from production routing operational scrap. In this case since assembly scrap is based on production operational scrap, when we run the cost estimate the costing lot size is in CK11N is showing 950 LB (costing lot size is 1000LB in material master).

How do we handle this scenario?

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

0 Answers