Hi Consultants,
In my process order, when we batch determine a material, the Batch field of the Batch key 1 is always grayed out. Even if only partial batch determination applied.
EX. Stocks of Material A = 100
in Proc Ord Material List (Material A requirement = 150)
after batch determination
Material A 50 xxxxxxx Batch Key 1
Material A 100 batchA Batch Key 2
the "xxxxxxx" is grayed out and non-editable. How can I set up that if there is still a requirement that doesn't have a batch yet should be editable still?
Thanks,
Kumar