Hi Consultants,

In my process order, when we batch determine a material, the Batch field of the Batch key 1 is always grayed out. Even if only partial batch determination applied.

EX. Stocks of Material A = 100

in Proc Ord Material List (Material A requirement = 150)

after batch determination

Material A 50 xxxxxxx Batch Key 1

Material A 100 batchA Batch Key 2

the "xxxxxxx" is grayed out and non-editable. How can I set up that if there is still a requirement that doesn't have a batch yet should be editable still?

Thanks,

Kumar