Dear all,
Assuming there is a plant (XYZ), where only one shipping point (ABC) is assigned in the shipping point-plant assignment (i.e. XYZ-ABC).
In the shipping point determination, where formula is: Shipping condition + Loading Group + Plant = Proposed Shipping Point
There is 5 different loading groups (i.e. 1,2,3,4,5).
Shipping condition = Standard (01)
If I want to use the same shipping point (ABC) assigned to the plant XYZ for all loading group combination, is it possible?
Example:
1. 01 + 1 + XYZ = ABC
2. 01 + 2 + XYZ = ABC
3. 01 + 3 + XYZ = ABC
What are the implications?
Pls enlighten.
THanks..
Rgds.