Hi ,

I have done the result recording for an inspection lot. the inspection type is IN-Process Inspection for which I have eb=ven taked thew UD. Now my doubt is how to do the inspection for GRfor production. i.e Inspection type 04.

Please explain.

Regards,

vivek

Accepted Solutions (0)

Answers (2)

Answers (2)

0 Kudos

Hello Vivek,

The in process inspection '03' is ususally created when releasing the production order and is designed for inspections made during the manufacturing process.

The inspection type 04 can be triggered at two different time points:

either at release of the production order 'early 04 inspection'

or at GR from Production 'late 04 inspection'.

If you want to work with both 03 and 04 you have to use the late 04 inspection type, this offers you the follwing advantages:

You don't have to eventually correct the inspection lot size, and you avoid that there two parallel inspections.

The 04 inspection lot is designed for post production (final production) inspections and is stock relevant as opposed to the 03 inspection type that is not stock relevant.

Regards,

Isabelle

Former Member
0 Kudos

Hi Vivek,

If the inspection type 04 active in the material master, system will automatically generate the inspection lot for each every GR from production.

Go to QA32 and process the result recording and UD.

Note: There is no relation between 03 and 04 Inspection both are separate track.

Let me know any doubt.

Regards,

Babu.S