Skip to Content
0
Former Member
Jul 14, 2008 at 06:44 PM

UOM with 5 backend systems

104 Views

Hello Experts,

We have SRM 5.0 integrating with 5 R/3 systems. We are looking for information on harmonization and synchronization of UOMs amongst SRM and all the 5 R/3 backend systems.

I know we can replicate UOM into SRM from only 1 backend R/3 system and u201CUOM table in SRM doesnu2019t have backend R/3 system reference.

Challenges:

1.The same unit of measure is set up with different UOM codes in the different backend system. eg: EA (each - ISO Code- PCE) in R/3 #1 is set up as EAC(each - ISO code PCE) in R/3 # 2. Whereas SRM can replicate UOM from only 1 R/3.

2.The decimal notation in the multiple backend is different for the same UOM. eg: R/3 # 1 has 3 digits and R/3 # 2 has 2 digits for the same UOM.

Please help.

Vijay