hi
is it possible to run MRP by storage location. pls advice. thanks
Hi,
MRP run can be executed for below
1. Material
2.Plant
3.MRP area
MRP area can be defined for
1. plant : you can define a plant or group of plants as a MRP area
2. Storage location : a storage location or a group of storage locations can be defined as MRP area, and then if MRP will be executed for this MRP area then effectively MRP run will be carried at storage location .
In MRP 1 view of material master "indiactor MRP area exists should be ticked. for the material to be planned for this MRP area.
3.Vendor: suppose we want to plan materials for a vendor separately then we can define vendor as a MRP area.
Hope this explains your question.
Please reward if useful.
Thank you
Anand
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
If you want to have MRP for Storage Location, then you need to go for MRP Areas.
Refer below link for further details..
http://www.sap123.com/showthread.php?t=57
Revert for further discussion..
Regards,
Siva
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.