on 02-22-2018 5:34 PM
Hi,
After a refresh of our Q/a system from PRD we get the error Work process restarted;session terminated.
Im trying to update SAPM/SAINT but the operation fails in different stages (I have gotten to import_proper). The workprocess restarts and the session terminates.
I have found this in the dev_w2 log:
***LOG BZY=> unexpected return code 26 calling INS [dbsynseq 590]
B ***LOG BZY=> unexpected return code 2 calling ins_ddlog [dbsync 1396]
B db_syflush (TRUE) failed
B db_con_commit received error 1024 in before-commit action, returning 8
M ***LOG R38=> ThICommit3, db_commit98 ( 001024) [thxxhead.c 14668]
M ***LOG R18=> ThCPIC, ThICommit () [thxxcpic.c 2620]
M in_ThErrHandle: 1
M *** ERROR => ThCPIC: ThICommit (step 4, th_errno 9, action 2, level 1)
On the OS level and in the database i can see the error:
SAP Basis System: Error at DB commit, return code 001024
I did a checkdb but on errors was found
The server setup is same ctempdev-w2.txtas in production where we dont have this problem
I have attached the dev_w2 log here.
Anyone got a clue on what could be wrong
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Jørgensen Torben,
Please look SAP note : 2499303 - Cluster buffer commit unsuccessful Error at DB commit, return code 001024
Thank you
Yogesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
85 | |
23 | |
11 | |
9 | |
8 | |
5 | |
5 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.