Hi,
While making the Subcontracting Challan the following error is reflecting.
The material document 4900074706 2008 does not have materials relevant for subcontrtg
I was check in Material Chapter ID combination in J1ID. there is a tick in Subcont.
Regards,
Ravindra
Edited by: Ravindra on Jul 14, 2008 6:45 PM