Skip to Content

Production order variance settlement

When we settle the variances of a production order, we are finding that SAP posts the variance through to COPA with the plant characteristic set as the planning plant of the production order.

Is it possible via configuration or some other method to have the production plant set into the plant characteristic of the COPA document?

(we see that when a production order is created, the settlement rule is automatically created with the planning plant set into the plant code, if that can be changed to be the production plant then I suspect that would solve our problem)

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

0 Answers