Hello everyone,

I am hoping someone can help me with an issue I am having setting up EWA on our production E-Recruiting system(PRC). I have worked through some of the setup guides offered by SAP but cannot seem to verify every step I did worked 100%. Here is what I have so far.

In T-Code SMSY under Landscape Components -> Systems PRC shows up and the RFC's are all listed and working. Under Logical Components -> E-Recruiting the system shows up and the production system is listed correctly. In Tcode SM59 I have created a "Back" destination called SM_PRCCLNT_BACK which i verified works correctly in SM59. The problem I am having is when trying to setup the system in SDCCN on Solution Manager(SOL) I receive a message the BACK destination cannot be found. Also when I go to SDCCN on the PRC system and then Goto -> Settings -> Task-Specific and try to add the SM_PRCCLNT_BACK RFC it prompts me to login which I have done with my login and the login of the user we want to use and both return "RFC test result: SM_PRCCLNT_BACK not functional. Ping failed to SM_PRCCLNT_BACK password logon no longer possible - too many failed attempts." I have checked this user in the system and it isn't locked and I have verified the password. I can even logon through the SAPGUI with the user. Lastly in the TCode Solution_Manager in SOL if I go to Operations Setup -> Solution Monitoring -> Setup EarlyWatch Alert, there are check marks in Active, Send to SAP and In EWA f.s for EarlyWatch Alert.

I appreciate any help or suggestions on how to resolve this issue. If you require further information please let me know. Thank you.