Former Member
Jul 10, 2008 at 08:53 AM

Parallel sequence with % split quantity

410 Views

Hi gurus,

Consider the following scenario:

Material A. It has 3 operations. Operation no. 2 is to be processed at 2 different work centers, so that the load is distributed and total operation time is reduced.

Production order is of 100 pcs. For operation 2, 50 pcs. are processed on 1 work center and remainig 50 pcs. on another work center. Both happen simultaneously.

How can i manage this in the routing with different %?

I will reward points all answers!!!