Hi,
How I can configure 2 EP 7.0 server for SSO by using SAP Logon ticket with same ECC 6.0 back end?
Developement EP 7.0 SP14 is already configure with ECC 6.0 back end now I want to configure my local EP 7.0 SP9 (Sneak Preview) server with same ECC 6.0 Development.
How I can acheive this?
I really appreciate if some one guide me.
Thanks.
Ashish.