Variant Configuration In QM

I have never worked on VC.Now we want to use it.So i want to know, from QM point of view; what are the steps involved and what will be my role in VC as a QM Consultant.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Jul 08, 2008 at 09:43 AM

    Hi,

    For example is you want to copy the values of a characteristic selected in Sale Order to QM Inspection Lot, then you can create Master Inspection Characteristics for QM. Then while changing the QM MIC, you may insert the Sale Order Characteristics in 'Class Char.' Here, when you select value for char. at sale order, the value gets copied to the QM Inspection Lot.

    Regards,

    Prashant

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member R Brahmankar

      Hi Rupesh,

      I am working in the variant configuration environment, ecc 6.0 where the KMAT material is created as finish goods. I have issue in the quality mgmt.
      the case is as under. I want to create the object dependency at the Master Inspection Characteristics (mic) level. I have done following.

      1. One class characteristics (class type 300) name “Z_segment” having range 100 to 150.this is class chars.
      2. Master inspection chars. “% Carbon” with class chars. “segment” (Mentioned above) as reference chars.
      3. Routing for the KMAT material with operation 0010. Where the MIC ‘%carbon”, “%metal “(% metal is plain MIC) are assigned. (I am also maintained this material with inspection point 0130 with no partial lot option)
      4. I now write the dependency for the MIC (%Carbon), but the dependency option from the top is gyved out.
      5. suggests me where I am wrong. Suggest way forward to write the object dependency.
      6. the inspection type is also maintained as insp. by configuration, and insp with task list. but i don't see the editable option in the extra- object dependency -editor, assignment for the characteristics line on the chars. overview of KMAT material routing. pl. guide me.

               

      Thanks Regards,