Skip to Content
author's profile photo Former Member
Former Member

scheduling aggerement(me32l) Bdc

Hi,

Iam doing Bdc for ME32L , Iam stuck in Table Control Checkbox.

i.e if i selecting Line item 10 That Particular Checkbox should get selected and if 20 respective checkbox .....

where every time i run bdc only first line item is getting selected. for all scheduling ageerement.

Please help me

Thanks & regard

Lalith.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jul 07, 2008 at 01:04 PM

    Hi,

    Do your recording in this way, first enter the schedule agreement on your main screen.

    Then in the second screen(Table control screen), we have atext box for item number at the bottom. What ever the item number we enter in this field, that item will become the first row of the Table control. So once coming to this screen, enter the current item number in the text box. and click enter. Then the item number will be in first row. so select first row of the check box and process.

    Thanks,

    Rajinikanth

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.