Hi everybody,
in a top-down planning scenario the person assigned to the top node (below the root) is supposed to perform the planning for his/her node. The results will then be distributed down the hierarchy. Once completed, the next level is supposed to enter their plan data with the associated distribution downwards.
When initiating the planning round with STS the person assigned to the top node receives an e-mail indicating that the planning round has been opened and the person can also enter the data.
Here my problem:
The data entry for the levels below are not AUTOMATICALLY locked. The person at the top has to specifically lock the nodes below in order for these to be locked (when this is done it works and can then be seen in UPS_HASH and UPS_LOCKS).
What I need:
that all nodes except the top node are AUTOMATICALLY locked when the planning round is initiated and that each level can only enter data when the level above has finished.
Is this possible with STS?
Greetings,
Martin