long term inspecion

Former Member
0 Kudos

Dear all,

I want to do long term inspection for my material.so for mic in control indicators i have activated check box of concern .even though after UD i am unable to do inspection .where might be problem.what more i have do settings .

regards

prasad

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Prasad,

The functionality of long term inspection is used, when there is need to record results for some characteristics after UD. So I hope you are doing such so, i mean, the RR is yet pending though UD is completed. Pls ignore if you are on the correct way, I have merely shared a practical possibility.

Dear, Deepak,

I think your confusion/question about the function of longterm characteristic, is also clear herewith, that it don't generate any lot new inspection lot.

Regards,

Shyamal

Edited by: Shyamal Joshi on Jun 30, 2008 11:25 AM

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

Please check if you have selected long term characteristic as required characteristic if you have selected long term characteristic as a optional characteristic then it only works if they are set for processing before inspection completion.

Thanks

Sanjay

Former Member
0 Kudos

Hi

Does the long term inspection generates any inspection lots or it works only for the UD done inspection lots

Kindly through much light on to it

Thanks

Deepak Goura