cancel
Showing results for 
Search instead for 
Did you mean: 

How to set a Release Strategy using "Total value of the Requistion" at Item

maruthi_ram
Participant
0 Kudos

Hi Experts

I am trying to set up a release strategy at Item level but want to use the characteristic "Total value of the Requistion".

I am unable to get the Release Tab either at the item Details or at Header .

Where am i going wrong ??

Kindly reply.

cheers

Maruthi Ram

Accepted Solutions (0)

Answers (2)

Answers (2)

dheeraj_vaishampayan
Active Contributor
0 Kudos

Hi ,

Requirement seems to be conflicting :

I am trying to set up a release strategy at Item level but want to use the characteristic "Total value of the Requistion".

I am unable to get the Release Tab either at the item Details or at Header .

Can u explain the scenario of requiring this

Reg

Dheeraj

Former Member
0 Kudos

Check wether u maintained indicator for item level release at configuration.

maruthi_ram
Participant
0 Kudos

Hi Santosh

But where do i flag this indicator for Item level release

will you tell me the exact step

cheers

Maruthi ram

Former Member
0 Kudos

SPROMM- PurchPur requi..-Rel stra with classification---

Release groups---

Here do not tick overal release Pur Requisition.

maruthi_ram
Participant
0 Kudos

Hi Santosh

I didnot flag the check box at all.

My scenario:

I am putting a Release strategy with different characteristics.

So my PR will have many line items with individual release.

But again for the same PR i want a overall release if the total value of PR crosses 10,0000 EUR say.

How do i do ???

Cheers

Maruthi

Former Member
0 Kudos

You can only use one type of release strategy either at item level or overal. .

If u need you can refer SAP note on this.

maruthi_ram
Participant
0 Kudos

Hi

Yes. In SAP Help also it is given the same.

But will you give the SAP NOTE number for reference.

Thanks

Maruthi