hi all,
i have maintained a material material master, sold to etc pr00 conditions maintained, schedule line is determined correctly but i am still getting this message while saving the order
"Product 234345 does not have schedules assigned. Contact system administrator
Message no. ZV276"
can anybody help?
Sa