Skip to Content

Break up of Cost compoenent Structure

Feb 14 at 03:02 PM


avatar image

Hello Friends,

For one of our client, Direct costs like freight, Loading & Unloading charges are inventorised by creating as condition type in PO. So during GRN itself, all these costs are added to material cost.

But the requirement in COPA, Break up of freight Cost, Loading Charges and Unloading Charges required and needs to be reported in seperate value fields.

Is it possible to show it as seperate cost component in cost component strucuture

Please advise how this can be achieved.



10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

2 Answers

Gabriel Felipe Coleti Feb 14 at 05:10 PM

Dear Usha,

That is the use of cost component structure, split and combine material costs in cost components.

Basically, really basically, this definition is set in OKTZ transaction code. After that, you can connect the cost component to the respective value field in KE4R.

You can find a thousands of documents and blog posts in the community to helps you in what you want.

Best regards,

Gabriel Coleti

10 |10000 characters needed characters left characters exceeded
Ushaganesan ganesan Feb 19 at 11:13 AM

Dear Gabriel,

Thanks for your response. I agree that it is part of cost component structure.

But my question is, this component structure is basically replica of planned cost.

However the actual cost might (definitely) be different.

For instance, freight cost can be considered as $10 in planned cost for a material. However actual freight cost (inward) will be different for PO to PO.

In CO-PA this actual freight value should flow and NOT the planned value.

So in such cases, how can we capture the actual freight cost in CO-PA.

Hope I have put across my requirement clearly..