Hi Friends,

I need to extended the release level(code) for the purchase order when I tried to simulate the release the system shows the error as Release prerequisite missing. kindly help to solve this problem

Regards,

Renuga.A

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Hi

Goto MM-Pur-Pur Ord-Rel Pro PO-Def Rel Pro for PO-

In this Rel Stgy, New entr, Fill the details

Next pre requis..

The vertical person want to release the PO (final approver) then the horizontal person want to release the PO first (Viewer)

Tic the same appropriately to enable that

Regards

Ram

Former Member
0 Kudos

Hi,

i have assigned 3 level .2 level is working fine but 3 level is not triggering . can you explain me release prerequisit .

Regards,

Renuga.A

Former Member
0 Kudos

go to release strategy thru spro-here double click on the particular release strategy-here u will find release prerequisite tab-select it-in it u will find that there are two set in which one set is ticked and the other is not.the set which is ticked in that u will find that the last release code which u have extended is not ticked.do it,check the release indicator,and release simulate and save.

regards,

indranil

former_member192897
Active Contributor
0 Kudos

Hi Renuga,

Observe the Release Prerequisites below which is having three release codes.

Code\release prerequisite

C1 C2 C3

C1

C2 *

C3 * *

Apart from the above configuration you have set the Release status also. Procedure will depend on this one only. Ie who should release the doc first and who is next.

Reg,

Ashok

  • Reward if useful.

Former Member
0 Kudos

Hi,

I have already assign what u said but system shows the same message . what changes i have to make.

Regards,

Renuga.A

Former Member
0 Kudos

Hi Rn,

Release startegy is very sensitive setting so please redo the release startegy process.

Check this link for your reference

http://www.sap123.com/showthread.php?t=59

BR,

NJK

Former Member
0 Kudos

Go to SPRO - IMG - MM - Purchasing - PO - Release procedure for PO - define release procedure for PO.

double click on release strategies, then double click on your release strategy.

click release prerequisites to enter the prerequisite of your release strategy.

reward point if useful

Former Member
0 Kudos

This caused as you not ticked in release strategy prerequisites. You should define there who should release first and then next level.

Regs,

Appie

Former Member
0 Kudos

For this go to release strategies - > select strategy and select release prerequisites.