Hi everybody,
I already do all topics that we need to activate Batch management related with QM, the problem is it only works for one material , when I use another material that have the same characteristics and Batch class, the result of the QM inspection doesnu2019t appears at MSC3N. Can anybody help me?
Thanks a Lot
Ivette