on 06-25-2008 5:42 PM
Hello Gurus,
I had a question. I have created Alternate BOMs and Routings for a Material. How through Configuration/or Material Master settings Can I control, as to when MRP derives result from Primary BOM/Routing or Alternative BOM/Routing.
Thanks,
Sachin
Hi,
Please check what SAP help says:
http://help.sap.com/saphelp_47x200/helpdata/en/f4/7d2aea44af11d182b40000e829fbfe/frameset.htm
(I assume you could use production version - C223)
BR
Csaba
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
For BOM selection, system will check BOM selection method in material master of MRP4 view.
BOM selection by Lot size, Date, Production version & Only by prod version.
Addition to that BOM selection by Selection ID defined in plant parameter. This selection ID consists of BOM priority & Usage.
Manually you can not control BOM selection.
For routing selection, system will check Lot size. If lot size not matched with required qty, system avoid the lot size & consider the date.
In addition to that system will consider Task list type, priority, Usage & Status.
In Order type dependent parameter(OPL8), you can configure whether system should select routing automatically or manually.
Regards,
Dharma
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
create production version for these BOMs and routings combination. and then use the quota arrangemet.
but definetly u can not control online.
it should be mantiained b4 MRP run
Pravin Mukkawar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
I have an option may not be a perfect solution but a workaround. Make the Main BOM or routing (routing is not relevant for MRP) status as in-active and run the MRP. Please test it and let us know.
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
97 | |
8 | |
8 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.