Skip to Content
0
Former Member
Jun 24, 2008 at 08:47 AM

Sloc to Sloc transfer

177 Views

Hi

Is it possible to transfer a valuated stock material to another sloc without value? Both the Slocs are in the same plant.That means the value is charged of but the quantity is still tracked.

However the reversal of the same should valuate the stock again.

Thanks

Rahul