Hi,all
I know when I need to make changes to the default movement type for PS,OPT1 is available.
But if I have two different project type,P & Y, and I must give these two types with two different movement types,as I see in OPT1,there's a key field development class,I can define a new development class here with default new movement type,but how can I use it and assign it to the different project type
BTW,charge the reservation is a need.
Edited by: Leo Zheng on Jun 24, 2008 9:19 AM