on 06-21-2008 6:37 AM
Hi all,
Is it possible to fix more than one doc type for automatic creation in ps for material creation in internal activity in network?
My scenario is i want to fix auto generated PR with account assigment category N (network) for the material in internal activity of network
Right now the system is generating PR with account assigment category Q(project make to order)
regards
pv
Hi,
While assigning material to activity, you need to select item category as "N" which will bring account assignment category as N for you. Please not that account assignment category "N" is used when you want to post your entries to consumption.
Regards
Rahul
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hai,
I think you can select only one document type in Automatic purchase reqisition thru, network.
If you want to select different Doc. type then go to me51n(Manual Purchase requisition).
Thanx
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi all,
Thanks every body for the valuable comments
The procurement indicator for materials in network comes with materials as a non stockable item as default
if i try to change item category in procurement indicator to 'L' ie for stock
the material reservation goes to project
can anbody give idea how
to get material reservation for project stock and cost following under network
Hi Rahul,
I want the material to be in stock ie "L" in item category
my problem is i want to catch the material cost against netwrk actvty in my budget report s_alr_87013558
but the PR generated with account assignment Q pulls the material value to wbs in the report
i hope the scenario is clear
please advice
regards
pv
Hi,
The report you are looking at is the budget report.
The budget is only assigned to the WBS elements.
The value assigned is calculated for the various activities and orders assigned to that WBS Element. And while reporting these cost values are rolled up/ accmulated at the WBS element level to compare the budget and the assigned value.
So the option you are trying is not possible with the standard SAP Report.
Hope its clear.
Thank you.
Hi,
For your 1st requirement , you have to use user exits COZF0001 and COZF0002.
For your second requirement (fix auto generated PR with account assigment category N (network) for the material in internal activity of network ), you can fix the account assignment category N in OPTT transaction.
Hope this helps.
Regards,
Amit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
1. Maintain the appropriate Procurement indicator in OPS8
2. Maintain this in OPUU.
thanks.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
101 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.