Skip to Content

Equipment number tracking in REM scenario

Feb 09 at 05:00 AM


avatar image

Dear Experts,

How to track Component equipment numbers which are consumed in header Equipment number?

We have REM scenario which is I think very common in serialised assembly consumption.

for example I have Serialised Car as a final product and Component required to manufactured it also serialised like Engine , Gear Box etc.

I have created Equipment master (Synchronous with Serial number) for CAR, Engine & Gearbox.

so once Car get dispatched & in future i need to check Engine equipment number & Gear box Equipment number which are consumed in that CAR. what is standard methodology provided by SAP for such scenario?

Please Guide.


Prasad J.

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

0 Answers