Skip to Content
author's profile photo Former Member
Former Member

Standard Cost Estimate

Dear All,

I am having one FERT product which is our by product and we will be selling it into the market.

Now when we are making the invoice for this product, it shows the error as mentioned below:

Valuation with material cost estimate: error with product "600000421"

Message no. KE350

Diagnosis

In Profitability Analysis (CO-PA), the system tried to valuate a line item using the current standard cost estimate.

In order to determine the current plan period, the system needs to read the valuation segment of the material master.

The system has found that the current plan period is not filled forproduct "600000421" in plant "1002".

Display material (View: Costing)

The system looked for the material cost estimate using costing key "001", as defined in the Customizing settings for CO-PA.

System Response

The document cannot be processed.

Procedure

Contact your system administrator.

Now the problem is that while we are running the standard cost estimate for the same product, the system asks for BOM which we have not created because its out By-Product.

Now without standard cost estimate for the same product, we cant sale the material so what can we do for it???

is there anyway???

Please help me in this regard.

It urgent for us!!!

Regards,

Jigar

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jun 19, 2008 at 06:48 AM

    hi

    1) u said that u are not maintaing BOM . then how u are producing FERT material ?

    2)600000421" is it a raw material ?

    if its ur raw material using to procedure FERT material u have to main tain Material master costing tab screen wich will give value for this . Concult ur MM consultant. to maintain that screen based on valuvation class.

    if not tell me about it.

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      any how but u have to main tain the BOM wher for this by products we have to tick by product check box .

      in material master for this particular material we have to main tain costing view then only system will take the price from that to esitimate the cost.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.