is it possible if i maintain one control key ( ex. PP01 ) for all operations in the routing? this control key has automatic goods receipt checked. is it logical that everytime i confirm an operation, a GR (101) would occur?
or should i maintain only 1 operation whith auto GR (the last) one, so upon confirmation only would the GR occur