Skip to Content
author's profile photo Former Member
Former Member

standared report for time ticket for production (t-code co11n)

is there is standared report for time ticket for production?

from the t-code co11n i want to calculate productivity, utilisation, efficiancy, loss time etc..

otherwise any developed report for above criteria means kindky post...

Edited by: partha sarathi on Jun 19, 2008 7:16 AM

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Jun 19, 2008 at 05:20 AM

    hi,

    check the standard transaction COOIS.

    reward points if hlpful.

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      thks goutham,,

      i'm developing a report which is related to t-code co11n.

      from that am caluclating productivity, utilisation, efficiancy, loss time, set time ,run time...

      can i get the above data from coois std rep...?

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.