Product Master - APO

Hi ,

Work-scheduling View of Material master is having field called " Prodn Controller " which can be seen at APO Product master level in product master overview tab as Prodn planner above SNP planner . Work Scheduling View in SAP R/3 is maintained generally if Materila is In - House manufactured ( type E) now when we CIF Material with External procurement is this field mandatory to maintain for Externally procured materials too ? If not how this settign can be done to aviod to maintain work scheduling view in R/3 for Externally procured material still CIF materila master to APO as product master ?

Thanking You

Ratnakar Pawar.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jun 19, 2008 at 04:34 AM

    Hi

    No need to maintain Work scheduling view for external procured items. The value of MRP controller field in MRP1 view will be the Production Planner value in APO

    Hope u r clear now

    regards

    Vijay

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.